Blog Archives

Fixed Ladder-Dok Instructions

Step 1: Place Ladder support along gutter at desired location. Use a pencil to trace inside diameter of both screw holes. Set the support out of the way and drill or punch both holes making sure screws will pass through

Posted in Fixed Ladder-Dok

Chimney Flashing Kit Instructions

 Step 1:  Shingle up to and across the base of the chimney to a point where the tar-line is within at least 4 inches. Cut shingles to fit around the chimney base. Note: the shingle rows must continue to line

Posted in Chimney Flashing Kit

Pro Flash Instructions

Step 1: Align flashings around chimney base prior to installing and mark along tops (see dashed line). This will help you in piece by piece installation alignment. Next, extend bottom flashing past chimney sides 2 to 3 inches. Notch top

Posted in Pro Flash